|
Located in the Municipal Complex, 151
W. Passaic St., Rochelle Park, NJ
Phone:201-556-0521,
Fax: 201-556-0523,
buildingdept@rochelleparknj.gov
Hours of Operation: Monday through Friday 9:00am to 4:00pm
|
Department Contacts
Please call Gloria Cottrell to schedule inspections. Specific inspection
times are not granted |
BUILDING
Richard Bolan - Construction Official/Building Subcode
Official/Building Inspector
201-556-0522 ext.102
Inspections usually scheduled between 9:00am &
4:00pm
Other times available as needed.
PLUMBING
Michael O'Connell
- Plumbing Subcode Official/Plumbing Inspector.
Inspection hours:
Monday 11:00am to 1:00pm, Wednesday 7:00am to 8:30am, Friday7:00am to
8:30am. |
FIRE
George Georgeou - Fire Subcode Official/Inspector
As needed
ELECTRICAL
Richard Bolan - Electrical Subcode Inspector
Inspections usually scheduled between 9am and 4:00pm
Other times available as needed.
ZONING/PROPERTY
MAINTENANCE
Richard Bolan
TECHNICAL
ASSISTANT
Gloria - 201-556-0520 ext.100 |
| |
|
|
|
Building permits and
inspections are required for most types
of construction and alterations (residential and commercial) including:
re-roofing, siding, additions,
sheds, pools, new and replacement
furnaces, water heaters, central
air, sprinkler systems (both fire and irrigation), fuel tanks (abandonment
and new installations), alarm systems (burglar and fire), fences, porch
enclosures, attic "conversions, basement renovations,
fireplaces,
demolitions, sump pumps,
plumbing and all
electrical work.
Contact the building department to help you determine if a permit is
needed. We can explain what kind of documentation you’ll need with your
application and help streamline the
process for you before you begin.
Getting a building permit blank can be as simple as signing on to the
Rochelle Park Municipal web site or going to
http://njpermits.com. Blank forms for
all the required types of work are available to be
downloaded,
completed at home and brought or mailed
to the Building Department.
If construction takes place outside of the existing structure or if your
applying for a permit for sheds,
fences, decks, pools or driveways, bring your property survey to the
building department so we can review the work for compliance with township
zoning ordinances.
You can do your own electrical and
plumbing work ONLY in your owner occupied,
single family detached dwelling.
Once the work has been approved, a
certificate is issued to permit use
of the improvement. This certificate also releases the owner to make final
payment to the contractor. This law
was enacted by the Division of Consumer Affairs to protect owners from
consumer problems related to unsatisfactory work at the end of a job. By
law, you must not make the final payment
until the Building Department inspects and approves the
construction.
Building permits help to insure safe occupancies. If you
see construction being done without
permits or illegal occupancies please contact the
Building Department. All
information is handled in a manner insuring our confidentiality.
|